EQUIPMENT:
Potain MR225
Radius Group is supporting with Winvic Construction Ltd. on their latest project – a 33 storey, multi-room student accommodation new build; with 9 and 12 storey blocks to the sides.
This impressive development includes a mix of en-suite cluster, studios, and accessible studio units, along with ground floor external landscaped areas, internal reception, hub, fitness, and cafe spaces.
Due to the close proximity of the site to neighboring buildings, the MR225 tower crane was the ideal choice for this project. Erected to 77m tall in June 2023, the crane will be tie & climbed to reach a height of 102m in the summer of 2025. It will be on-site for a total of 125 weeks, with a projected completion date of December 2025.
You can watch a time lapse of the project here
To find out more about our Tower Crane Hire click here or call 01604 622 865 to speak to our Tower Crane Division
Radius Group are a dedicated team of experienced site specialists backed by an industry-leading technical department. We offer a comprehensive ‘turnkey’ service, from initial consultation to project completion.
The project utilized a Potain MR225 tower crane. This model was chosen as the ideal solution due to the site's close proximity to neighboring buildings, which is a common challenge in urban construction.
The Potain MR225 crane was erected in June 2023 and is scheduled to be on-site for a total of 125 weeks. It will be tied and climbed to reach a height of 102 meters by summer 2025, with project completion expected in December 2025.
The Potain MR225 tower crane was deemed ideal for this project primarily due to the site's close proximity to neighboring buildings. Its characteristics made it suitable for navigating the constraints of a dense urban construction environment for a 33-storey structure.