Skip to main content

What is the Potain MDT368-L16 crane and its role in the 103 Colmore Row development?

In September last year, Radius NFT erected a Potain MDT368-L16 to 100m (330ft) ahead of the demolition of the former NatWest Tower building, Birmingham, UK.

The crane was erected within four days (including both ties back into the building) with roads around Colmore Row being closed to allow for the delivery and assembly of the heavy-duty equipment.

Liebherr LTM1350-6.1 telescopic mobile crane was used on a luffing jib configuration to facilitate the safe installation of the Topless Tower Crane. 

This crane is still hard at work today dismantling the building…

“Perched high above the city, the view from Bob Brown’s ‘office’ takes some beating. Bob, the tower crane operator on the new 103 Colmore Row development in Birmingham city centre, reveals what it’s like working 350ft above the ground…”

Remain part of the conversation. Subscribe to our blog by clicking on the subscribe button at the bottom of your screen!

Frequently Asked Questions

1 What type of tower crane was deployed for the 103 Colmore Row demolition project?

Radius NFT erected a Potain MDT368-L16 tower crane to a height of 100m (330ft) for the demolition of the former NatWest Tower building. A Liebherr LTM1350-6.1 telescopic mobile crane was also used to assist with its installation.

2 How long did the crane erection process take at 103 Colmore Row?

The Potain MDT368-L16 tower crane was erected within four days. This timeframe included the installation of both ties back into the building structure.

3 What logistical considerations were involved in the crane setup for this project?

Roads around Colmore Row in Birmingham were closed to allow for the safe delivery and assembly of the heavy-duty equipment. A Liebherr LTM1350-6.1 mobile crane with a luffing jib was specifically used for the safe installation of the topless tower crane.