LOCATION:
Essex
Project Background
British Solar Renewables is delivering the Dengie Solar Park, a major renewable energy project located in Essex. The site is designed to generate 19 MW of solar power and includes a 5 MW battery storage facility, contributing to the UK’s strategic net zero targets. Radius Group was appointed as the principal lifting contractor to ensure the safe and efficient installation of four large-scale Battery Energy Storage System (BESS) units.
Scope of Works
Radius Group provided a comprehensive contract lifting solution, including all lifting operations supported by our in-house specialist team.
The team comprised:
Appointed Person (AP)
Lifting Supervisor
Slinger/Signaller
Services Delivered
Each BESS unit – valued at approx. £800,000 each – weighed approximately 38te, requiring high-accuracy lifting within tight spatial constraints and ground pressure limits.
Need Help With a Complex Lift?
From complex multi-tonne lifts in busy urban environments to challenging plant installations in confined spaces, we deliver with precision, safety & efficiency.
📞 Call us on 01604 622865
Radius Group are a dedicated team of experienced site specialists backed by an industry-leading technical department. We offer a comprehensive ‘turnkey’ service, from initial consultation to project completion.