Radius uses one-off tilting frame to install BP Pulse Hyperchargers
BP Pulse are rolling out the installation of Alpitronic Hypercharger™ Units (HYC-300 and HYC-150) nationally across the UK & Worldwide. In some of the indoor or underground car parks, the headroom is very limited which presents significant challenges to enable their installation.
The Hyperchargers require a horizontal delivery, travelling up/down slopes, with limited headroom before being rotated 90° to the vertical for final installation, which is all to be achieved without being lifted from above using conventional methods.
A collaboration between Radius group, BP Pulse and Comtec Srl, resulted in the design, manufacture and testing of a bespoke Tilting Frame, for this unique installation process. The one-off Tilting Frame designed for our client envelops the HYC-300 and HYC-150 Hypercharer Units to provide a safe and secure method of handling each unit.
Read more in our case study here
If you want to know more about our full end-to-end contract lift services please click here
Remain part of the conversation. Subscribe to our blog by clicking on the subscribe button at the bottom of your screen!
Skip to main content



