What lifting equipment was utilized for the project?
A tower crane was the primary equipment utilized for the project. This specific type of crane was essential for the lifting operations.
What was the project's location?
Birmingham
What was the primary operation involved in the project?
26 Storey Building Construction
Skip to main content
