What equipment was used for this project?
Potain MRH295 H20
Working with our repeat customer, BAM, we are supporting them with the redevelopment works at 11 Belgrave Road, which will provide 108,000 sq ft. of Grade A office space.
The scheme is the first in the UK to achieve an Excellent 5.5-star NABERS design-reviewed target rating for building efficiency and one of only three in the country to be pre-certified.
For more information about the scheme, click here
The Potain MR295 was erected in the summer of 2022, when development works began – and will remain in situ – until completion which is expected to be January 2024. This particular model is designed specifically to work in confined spaces and is a popular choice for mixed use schemes in built up and restricted areas.
To find out more about our Tower Crane Hire click here
Radius Group are a dedicated team of experienced site specialists backed by an industry-leading technical department. We offer a comprehensive ‘turnkey’ service, from initial consultation to project completion.
The Potain MRH295 H20 tower crane was used for the redevelopment works. This model was specifically chosen because it is designed to operate effectively in confined spaces, making it ideal for mixed-use schemes located in built-up and restricted urban areas like Belgrave Road.
The Potain MRH295 H20 crane was erected in the summer of 2022 when development works commenced. It is expected to remain in situ until the project's completion, which is anticipated in January 2024.
Yes, the scheme is the first in the UK to achieve an Excellent 5.5-star NABERS design-reviewed target rating for building efficiency. It is also one of only three projects in the country to have received this pre-certification.