EQUIPMENT:
Potain MR219 J10
The Radius Group tower cranes have been instrumental in the Wornington Green Phase 2b regeneration project – for repeat customer Bouygues UK – which will result in over 230 new homes. Find out more about the scheme here
Erected in Q3 of 2022, the Potain MDT219 J10 trio will remain on site until the project’s completion in March 2024. With a towering height of up to 62m and a jib length of 30m, the TC2 crane is the tallest of the three. The Potain flat top-slewing tower cranes are perfect for large infrastructure projects, high-rise job sites, crowded urban areas, and wide-open spaces, making them the ideal crane for the Wornington Green scheme.
If you have any specific questions or if there’s more information you’d like to discuss about the Wornington Green scheme, please get in touch by calling 01604 622 865 or email rachaelswanston@radiusgroup.co.uk.
For more information on our tower crane hire services click here
Radius Group are a dedicated team of experienced site specialists backed by an industry-leading technical department. We offer a comprehensive ‘turnkey’ service, from initial consultation to project completion.
The Wornington Green Phase 2b regeneration project in London aims to deliver over 230 new homes. Radius Group supplied tower cranes for this scheme, working with repeat customer Bouygues UK.
A trio of Potain MDT219 J10 flat top-slewing tower cranes were instrumental in the Wornington Green project. The tallest of these, TC2, reached a height of up to 62m with a 30m jib length.
The Potain MDT219 J10 cranes were erected in Q3 of 2022 and are scheduled to remain on site until the project's completion in March 2024. This demonstrates a long-term commitment to the regeneration works.
Potain flat top-slewing tower cranes are well-suited for a variety of challenging environments, including large infrastructure projects, high-rise job sites, and both crowded urban areas and wide-open spaces. This versatility made them ideal for the Wornington Green scheme.