What lifting equipment was used for this project?
A Tower Crane was utilized for this project, providing essential lifting capabilities for the Tie and Climb operation.
What was the location of this lifting project?
The project was located in London, specifically at Plot 18 Greenwich Peninsula, a key development area.
What specific lifting operation was performed for this project?
Tie and Climb